Big surfaces. Bigger savings.
Large roofs gain the most heat and offer the fastest payback. Most commercial installs recover cost in 1.5-3 years.
Where heat hits your operations
Industrial roofs
Flat or corrugated metal, TKG sheets under the roof skin or over the slab stop the primary heat gain.
Process & storage areas
Stable indoor temperatures reduce spoilage, machinery stress, and HVAC operating hours.
Office & retail blocks
Consistent comfort across large floorplates with significantly lower cooling loads.
Roof insulation
Two methods depending on your setup, both work for new construction or existing facilities.
Roof Insulation
The plastic sheet layer stops the finish from bonding directly to the insulation, allowing slight movement without cracking. Waterproofing (water-based or oil-based) is verified before any sheets go down.
False Ceiling
Common in offices and retail spaces that already use a suspended ceiling. No roof access needed, works for new or existing buildings.
Wall insulation
One method, works on either face of the wall.
Wall Insulation
Can be done on the inside or the outside of the wall, no cavity required. Especially valuable for west-facing walls exposed all afternoon.
Bonus benefit: noise reduction. The same wall buildup that blocks heat also cuts down noise transfer, quieter interiors, less street or factory noise coming in.
Why Most Commercial Projects Choose TKG
Commercial buildings have unique insulation needs. TKG provides custom solutions in any density and thickness to meet your specific requirements. Whether it is office buildings, factories, warehouses, or retail spaces, we deliver premium insulation that protects your investment.
Common questions from facility owners
Can it reduce industrial cooling costs?
Significantly. Factories, warehouses and processing facilities see 25-40% electricity reduction. With large surface areas, payback is typically 1.5-3 years, then pure operational savings.
Will installation disrupt operations?
Installs are scheduled during low-production periods, weekends, nights or seasonal downtime. Most roof retrofits take 3-5 days and can be phased across areas to minimise impact.
More questions, including cold storage and freezer specs? See the full FAQ page.
See the FAQs →Ready to cut your facility's electricity bill?
Send your roof or wall area, get a precise price on WhatsApp.